Hydraulic pressure drift
HPR-02 main ram pressure drifting ±6%. Inspect seals at next changeover.
HPR-02·19:58:44·SEVERITY: WARNING
Inspection results, defect PPM, and batch holds for Line 4 — Shift B.
HPR-02 main ram pressure drifting ±6%. Inspect seals at next changeover.
Dimensional drift on CNC-07 accounts for 29 of the 88 dimensional defects.
B-10485 · INJ-04
14 DEFECTS / 120 SAMPLES · FLASH ON RIB 6
| Batch | Machine | Inspector | Result | Defects | Sample | PPM | Checked |
|---|---|---|---|---|---|---|---|
| B-10487 | CNC-01 | L. Ortiz | pass | 1 | 200 | 5000 | 21:20 |