Line running
Operations / Downtime

Downtime

Every stopped minute on Line 4 — logged, categorized, and acknowledged.

Open events
2
OLDEST 74 MIN
MTTR
18.4
MIN · ▼ 3.1 VS LAST WEEK
Minutes today
315
TARGET ≤ 240 MIN
Events this shift
7
4 PLANNED · 3 UNPLANNED
Availability loss
3.8%
OF PLANNED RUN TIME
Barrel heater circuit fault

INJ-04 zone 3 heater open circuit. Line stopped; work order WO-2214 raised.

INJ-04·20:52:11·SEVERITY: CRITICAL
StartedMachineReasonCategoryMinStatusAction
20:52INJ-04Barrel heater circuit faultMechanical74open

Minutes by cause — today

315 MIN
Mechanical179 MIN
Changeover56 MIN
Planned34 MIN
Material23 MIN
Quality + Safety23 MIN

Unplanned mechanical failures are 57% of lost minutes today — the INJ-04 heater fault alone is 74.

Downtime by machine — today

1 stopped
INJ-04112 MIN
HPR-0249 MIN
LAT-0227 MIN
CNC-0722 MIN
CNC-0515 MIN
CNC-0312 MIN

Top offender INJ-04 holds 46% of today's lost minutes. Work order WO-2214 in progress.

Dual7 template preview — this is a fictional demonstration business.
TemplateAmber Lineworks
Theme
Remix this siteExit