Resource load
Atlas ERP rollout · 10 peoplePeople on project
10
Avg allocation
78%
Overallocated
2
Bench hours this week
36h
| Resource | Role | Team | Capacity | Allocated | Load | Next 4 weeks | Status |
|---|---|---|---|---|---|---|---|
PAPriya Anand | Integration engineer | Engineering | 40h | 46h | 115% | Overallocated |
Team capacity, next 8 weeks
Jul 20 – Sep 11Jul 20
62%
Jul 27
74%
Aug 03
86%
Aug 10
108%
Aug 17
102%
Aug 24
88%
Aug 31
69%
Sep 07
54%
The weeks of Aug 10 and Aug 17 exceed 100% allocation because the middleware build and data-migration dry run overlap. Consider moving the dry run to Aug 24 or adding a contractor for two weeks.