Line running
Operations / Line 4

Line 4 — Production overview

Live OEE, throughput, quality, and downtime for Shift B. Data refreshes every 30 seconds.

Log event
OEE — Shift B
87.4%
▲ 1.8 PTS VS SHIFT A
Availability
92.1%
▲ 0.9 PTS VS SHIFT A
Performance
94.0%
▼ 0.6 PTS VS SHIFT A
First-pass yield
96.2%
▲ 0.4 PTS VS SHIFT A
Open incidents
3
2 CRITICAL · 1 WARNING
Spindle temperature above threshold

CNC-07 spindle bearing at 96.2°C — limit 92°C. Load reduced 40%; maintenance dispatched.

CNC-07·21:38:04·SEVERITY: CRITICAL

Hourly throughput vs target

Running
TARGET 620
14:0015:0016:0017:0018:0019:0020:0021:00
Units producedBelow targetTarget 620 u/hr

Downtime by cause — Shift B

Attention
Mechanical142 MIN
Changeover47 MIN
Material23 MIN
Quality18 MIN
Safety8 MIN

238 stopped minutes this shift · top cause is 60% of total.

Machine status — Line 4

All machines
MachineTypeStatusOEE %U/HRLast event
CNC-015-axis machining centerrunning91.2612Tool change 21:14

Latest inspections

Quality
B-10487CNC-01
5000 PPMpass

Open incidents

3 open

Spindle temperature above threshold

CNC-07 · 21:38

Recent downtime events

Full log
StartedMachineReasonCategoryMinStatus
21:14INJ-04Barrel heater circuit faultMechanical74open