Line running
Operations / Assets

Machines

10 assets on Line 4 — live state, OEE, and last event per cell.

Total assets
10
LINE 4 · ALL CELLS
Running
7
▲ 1 SINCE SHIFT A
Attention
1
CNC-07 · SPINDLE TEMP
Warning
1
HPR-02 · SEAL LEAK
Stopped
1
INJ-04 · 74 MIN DOWN
Barrel heater circuit fault

INJ-04 zone 3 heater open circuit. Line stopped; work order WO-2214 raised.

INJ-04·20:52:11·SEVERITY: CRITICAL

CNC-01

5-axis machining center

running
OEE91.2%
Thrput612
Target640
Tool change 21:14

CNC-07 — 5-axis machining center

Detail panel · pinned from the status board · updates live

Attention
OEE
62.4%
Spindle temp
96.2°C
Axis load
41%
Runtime today
6.2 H
Last alarm
21:38:04

Recent events

  • 21:38Spindle temperature alarm — limit 92°C
  • 21:12Feed override set to 60% by operator
  • 19:47Tool 12 life warning — 8% remaining
  • 18:03Program D-4471 loaded for batch B-10484

Actions

Dual7 template preview — this is a fictional demonstration business.
TemplateAmber Lineworks
Theme
Remix this siteExit