ROON-CALL
07-19 22:14

CRN-009 grounded — hydraulic leak at boom lift cylinder. Rigging work at Yard 7 suspended until reseal kit arrives.

View repair RP-1094

Fleet operations

Asset Registry

FLEET 12 UNITS · 5 SITES · SYNC 14:32 UTC

UP6DEGRADED2DOWN2MAINT2AVAILABILITY 30D 83.3% · PM COMPLIANCE 91.4%

Units down

2

+1 VS LAST WEEK · CRN-009 GROUNDED

PM overdue

4

OLDEST 14 DAYS · CRN-009 HOSE INSP

Open repairs

4

2 CRITICAL · 1 MAJOR · 1 MINOR

Fleet availability

83.3%

10 OF 12 UNITS SERVICEABLE

TagAssetCategorySiteHoursIntNext dueStatus
GEN-2207Diesel Generator 400 kVAPower GenerationDepot North812090D2026-09-26OPERATIONAL
12 OF 12 ASSETS · 5 SITESSORTED BY TAG ASC

Intervals by Category

COMPLIANCE 30D
  • Lifting

    60D · 91% ON TIME

  • Power Generation

    90D · 88% ON TIME

  • Earthmoving

    120D · 95% ON TIME

  • Air & Pneumatics

    90D · 76% ON TIME

  • Material Handling

    90D · 100% ON TIME

Recently Serviced

LAST 14 DAYS
  • 07-14PMP-118Seal kit staged, impeller washD. MERCER
  • 07-10DRL-502Mast chain tension & lubeA. HADDAD
  • 07-06CNV-640Belt splice & tracking, 640 m runD. MERCER
  • 07-02FLT-221Brake & fork wear checkM. DUBE
  • 06-28GEN-2207Coolant & hose service, load test passR. OKAFOR
SYNC 14:32:07 UTC · API 200 OK · 12 ASSETSMASTLINE CMMS v4.2.1 · SUPPORT EXT 4410
Dual7 template preview — this is a fictional demonstration business.
TemplateMast Maintenance
Theme
Remix this siteExit