ROON-CALL

Work orders

Repair Log

12 TICKETS · 4 ACTIVE CREWS · SYNC 14:32 UTC

OPEN4IN PROGRESS3WAITING PARTS2CLOSED 30D3MTTR 13.2 H · DOWNTIME 7D 67 H

Open tickets

4

2 CRITICAL · OLDEST 16 H

Avg time to close

13.2 H

LAST 3 CLOSURES · TARGET 24 H

Downtime 7d

67 H

CRN-009 ALONE 41 H

Waiting parts

2

NEXT ETA JUL 22 · SEAL KIT

Ticket Queue

SORTED BY REPORTED DESC
  • RP-109407-19 22:14

    CRN-009

    ROUGH-TERRAIN CRANE

    Hydraulic leak at boom lift cylinder

    CRITICAL

Repeat Faults

LAST 90 DAYS
  • ×3CMP-330Discharge temp high — cooler foulingEVERY ~40D
  • ×2HVC-207Low-pressure switch trips at dawnEVERY ~55D
  • ×2FLT-221Mast chain stretch beyond specEVERY ~70D
  • ×2PMP-118Mechanical seal dripEVERY ~85D

CMP-330 cooler fouling is on its third strike — root-cause review recommended before the next 90D service.

Downtime by Asset

LAST 30 DAYS · HOURS
  • CRN-009

    41 H

  • FLT-221

    28 H

  • EXC-114

    12 H

  • TRK-118

    8 H

  • CNV-640

    6 H

SYNC 14:32:07 UTC · API 200 OK · 12 TICKETSMASTLINE CMMS v4.2.1 · SUPPORT EXT 4410
Dual7 template preview — this is a fictional demonstration business.
TemplateMast Maintenance
Theme
Remix this siteExit