01 — OUR PROCESS~36 WEEKS

From an empty lot to a set of keys, on a schedule you can hold.

Nine months, seven stages, six photo updates, one named project lead. Here is exactly how a Framing Square home gets built.

02 — THE BUILDSEVEN STAGES · ~36 WEEKS
  1. 01

    Design consultation

    WEEK 0

    We sit down with your must-haves, budget ceiling, and timeline. You leave with a shortlist of plans and communities that actually fit the number.

  2. 02

    Lot & plan selection

    WEEK 2

    Walk available lots, review sun and grade, and lock the plan. Lot premiums and orientation are set in writing before anything else moves.

  3. 03

    Financing & fixed-price contract

    WEEK 4

    We coordinate with your lender and issue a fixed-price contract with itemized allowances. The number is the number from here forward.

  4. 04

    Permits & site prep

    WEEK 8

    We pull permits, clear and grade the lot, and pour foundation. You get the dated milestone plan and your project lead's direct line.

  5. 05

    Framing & rough-ins

    WEEK 14

    Framing goes up square and inspected, then electrical, plumbing, and HVAC rough-ins. First on-site walkthrough happens here.

  6. 06

    Finishes & fixtures

    WEEK 28

    Drywall, cabinetry, counters, flooring, and paint. You confirm selections against your allowance sheet at a design review.

  7. 07

    Walkthrough & keys

    WEEK 36

    Final inspection, a two-hour orientation walkthrough, and keys. Your ten-year structural warranty starts the day you close.

03 — WHAT TO EXPECTAVERAGES ACROSS 2024–2026 CLOSINGS
36 wk
LOT TO KEYS
98%
ON-SCHEDULE
6
MILESTONE UPDATES
1
NAMED PROJECT LEAD
04 — QUALITY & WARRANTYBUILT SQUARE, WARRANTED LONG
Framing inspection on site

Three checkpoints before you ever see it.

Every home passes an internal framing review, a pre-drywall systems check, and a final quality audit — on top of municipal inspections. You get the report at each stage.

Structural warranty
10 YEARS
Systems warranty
2 YEARS
Workmanship warranty
1 YEAR
11-month check-in
INCLUDED
05 — COMMON QUESTIONS
Can I customize a floor plan?+

Yes. Every plan has a published set of structural options — bump-outs, finished basements, additional bays. Non-structural changes are handled at your design review before framing.

Do you build on my own lot?+

We build on our lots in Aster Ridge, Junction 40, and Kestrel Park, and on scattered lots within Larimer and Weld counties subject to a site review.

What deposit do you require?+

A refundable $5,000 reservation holds a lot and plan. The contract deposit is 5% of base price, applied at signing and credited at closing.

What happens if the schedule slips?+

Our contract includes a delay remedy: if we miss the contracted close date for reasons within our control, you receive a daily credit until keys are handed over.

06 — GET STARTED

Ready to see your build on a dated schedule?